Standby generator install

A standby generator, installed start to finish

One quote and one crew for the pad, the switch, the gas, the permit and the inspection.

You choose the brand and the size with us, using a walk through what you want running. We handle the paperwork and the other trades, and you get the unit tested under load before we leave.

  • Natural gas or propane

  • Whole-house or essential circuits

  • Pad height set for your flood zone

Two electricians setting an electrical enclosure on steel posts outside a building under construction

When you need it

Signs it's time to plan one

You don't need all of these. Most people have two or three.

  • Outages last more than a few hours

    A long outage after a storm puts food, heat and cooling at risk.

  • Someone at home depends on power

    Medical equipment, a well pump or a sump pump can't wait for the grid.

  • You work from home

    A day without power is a day without work.

  • You're in a flood-prone or coastal zone

    Where the unit sits matters, so it is better planned than rushed.

  • The season is close

    Pad and permit work take weeks, and the pad can't go in once the storm is named.

  • You already own a portable unit

    A standby unit starts by itself and doesn't need a cord run through a window.

What the work includes

From the first visit to the test

Eight steps, in this order. Each one is on your quote.

  1. 01
    Day one

    Step 1: Site visit

    We walk the lot, open the panel, read the gas meter and add up your loads with you.

  2. 02
    After the visit

    Step 2: Written quote

    The unit, the pad, the switch, the permit and the inspection, each on its own line.

  3. 03
    Before work

    Step 3: Site plan and permit

    We draw the plan and file the electrical permit. The gas permit is booked alongside it.

  4. 04

    Step 4: The unit is ordered

    The deposit orders the unit. We tell you when it arrives.

  5. 05

    Step 5: Pad and conduit

    The pad is poured and cured, and the conduit is run to the panel.

  6. 06

    Step 6: Switch and gas

    The power is off for part of one day while the transfer switch is wired. The gas fitter connects the fuel.

  7. 07

    Step 7: Inspection

    The inspector looks at the pad, the wiring and the gas.

  8. 08

    Step 8: Test under load

    We start the unit with you there, run it under load, and show you the controls and the service schedule.

How pricing works for this job

What moves the price of an install

There is no price on this page, because the lot sets it. The written quote is the price.

  • The size of the unit

  • The run from the pad to the panel and the gas meter

  • Natural gas or propane

  • Pad height in a flood zone

  • Permit and inspection fees, passed through at cost

Lightning behind the dark silhouette of a house and trees at night

Questions

Questions about this job

What size generator do I need?

It depends on what you want running, not on the size of the house. We add up the air handler, the refrigerators, the well or sump pump and the lights you named, then pick a unit with room to spare. A whole-house unit carries nearly everything; a smaller one with an essential-circuits switch carries the list you chose.

Do I need a permit, and who pulls it?

Yes, for a standby generator. We draw the site plan and file the electrical permit with your town or the county, and the gas work has its own permit that we book at the same time. The inspector comes to the house before the unit is put into service.

Natural gas or propane?

If your street has natural gas, it is usually the simpler fuel: no tank to fill. If it doesn't, propane works with a tank set on your lot. We say which one we'd choose on the first visit and why.

Will it run through a hurricane?

A standby generator is built to run outdoors in bad weather, but nothing is a promise. Flooding, a gas supply that stops or a fault in the unit can all stop it. That is why we set the pad against your flood zone and test the unit under load before we leave.

Book the install before the season

Pad and permit work for new installs books from February. Send the details and we'll set a site visit.