Transfer switch and panel

The switch that decides where your power comes from

The transfer switch is what lets a generator run the house safely. It is wired at your panel or at the meter, and it is the part the inspector looks at most closely.

It disconnects the house from the grid before the generator connects, so power never flows back onto the line. We choose it with you, then wire it, label it and show you how it works.

  • Whole house or essential circuits

  • Labeled at the panel

  • Wired by our licensed electricians

The inside of an open outdoor electrical enclosure with labeled terminal blocks, breakers and colored wires

Two ways to wire it

Whole house, or the circuits that matter

Both are safe when installed to the permit. They differ in unit size and in what stays on.

  • Whole house

    Every circuit in the house stays on, and you don't choose in the dark.

    • Needs a larger unit

    • Suits houses with electric heat or two air handlers

    • One switch at the meter or main panel

  • Essential circuits

    A smaller unit carries the circuits you chose: refrigerators, lights, the air handler, a pump.

    • A subpanel holds the chosen circuits

    • A smaller unit and a smaller pad

    • You can add circuits later, within the unit's size

What the work includes

What the switch visit includes

The switch is one part of the install, and it can be done on its own for a unit you already own.

  1. 01

    Step 1: Panel check

    We open the panel and check its space, its rating and its grounding before we plan the switch.

  2. 02

    Step 2: Choose and label

    We pick the switch and, for essential circuits, label the circuits that move to the subpanel.

  3. 03

    Step 3: Permit

    We file the electrical permit for the switch.

  4. 04

    Step 4: Power off, switch in

    The power is off for part of one day while the switch is wired. We tell you the window ahead of time.

  5. 05

    Step 5: Inspection and test

    The inspector looks at the work, then we run a transfer test with you there.

Questions

Questions about this job

Will the power be off during the install?

For part of one day, while the transfer switch is wired in at the panel. We tell you the window ahead of time. The pad and the gas work happen with the power on.

Do I need a permit, and who pulls it?

Yes, for a standby generator. We draw the site plan and file the electrical permit with your town or the county, and the gas work has its own permit that we book at the same time. The inspector comes to the house before the unit is put into service.

What size generator do I need?

It depends on what you want running, not on the size of the house. We add up the air handler, the refrigerators, the well or sump pump and the lights you named, then pick a unit with room to spare. A whole-house unit carries nearly everything; a smaller one with an essential-circuits switch carries the list you chose.

Planning around a unit you own?

Send a photo of the panel and the unit's label by text. We'll say what the switch would involve.